LNG Chain

Country

Albania: LNG infrastructure

Albania has 3 LNG terminals and 6 tracked gas pipelines in the Global Energy Monitor tracker. It operates no LNG terminal capacity, and none is under construction.

Export capacity

no export terminal tracked

Import capacity

operating regasification

Pipelines

6

1,933 km tracked

Fleet

0

0 flagged, 0 owned from here

Import and export balance

DirectionTerminalsOperatingUnder construction
Export (liquefaction)0
Import (regasification)3

Figures are whole-terminal capacities in Mtpa, not adjusted for ownership stakes or utilisation.

LNG terminals in Albania

Import / exportTypeUnits
Eagle FSRUImportFSRUCancelledNot reported1
Port of Vlora FSRUImportFSRUCancelledNot reported1
Port of Vlora FSRU 2ImportFSRUProposed0.73 Mtpaproposed1

Gas pipelines crossing Albania

Any pipeline whose country list includes this country, including transit pipelines that only pass through.

CountriesSegments
Albania–Kosovo Gas PipelineAlbania, KosovoShelved212 kmNot reported12027
Eagle FLNG PipelineAlbania, ItalyCancelled128 km10 bcm/y12017
Ionian Adriatic Gas PipelineFier → SplitAlbania, Montenegro, CroatiaProposed540 km5 bcm/y12029
North Macedonia–Albania Gas PipelineBitola → KjafasanNorth Macedonia, AlbaniaProposed135 km2.02 bcm/y1
Trans-Adriatic Gas PipelineTürkiye, Greece, Albania, ItalyOperating878 km10 bcm/y12020
Vlora-Fier Gas PipelineFier → VlorëAlbaniaProposed40 km1 bcm/y12030

Chokepoint exposure

Chokepoint exposure is shown on each terminal page, taken from a hand-maintained trade-lane table. It is an editorial routing model of typical laden voyages, not vessel tracking. The exposure feed aggregates it by chokepoint.