Country
Cambodia: LNG infrastructure
Cambodia has 2 LNG terminals and 1 tracked gas pipeline in the Global Energy Monitor tracker. Nothing is operating yet, but 1.1 Mtpa is under construction, all of it regasification for import.
Export capacity
—
no export terminal tracked
Import capacity
—
1.1 Mtpa under construction
Pipelines
1
2,825 km tracked
Fleet
0
0 flagged, 0 owned from here
Import and export balance
| Direction | Terminals | Operating | Under construction |
|---|---|---|---|
| Export (liquefaction) | 0 | — | — |
| Import (regasification) | 2 | — | 1.1 |
Figures are whole-terminal capacities in Mtpa, not adjusted for ownership stakes or utilisation.
LNG terminals in Cambodia
| Import / export | Type | Units | ||||
|---|---|---|---|---|---|---|
| Botum Sakor LNG TerminalKoh Kong | Import | Not reported | Under construction | 1.1 Mtpaunder construction | 1 | — |
| Cambodia LNG Project | Import | Not reported | Cancelled | Not reported | 2 | — |
Gas pipelines crossing Cambodia
Any pipeline whose country list includes this country, including transit pipelines that only pass through.
| Countries | Segments | |||||
|---|---|---|---|---|---|---|
| CNGC's Inter-Provincial Gas Pipeline Network | Cambodia | Shelved | 2,825 km | Not reported | 1 | — |
Chokepoint exposure
Chokepoint exposure is shown on each terminal page, taken from a hand-maintained trade-lane table. It is an editorial routing model of typical laden voyages, not vessel tracking. The exposure feed aggregates it by chokepoint.