LNG Chain

Country

Cambodia: LNG infrastructure

Cambodia has 2 LNG terminals and 1 tracked gas pipeline in the Global Energy Monitor tracker. Nothing is operating yet, but 1.1 Mtpa is under construction, all of it regasification for import.

Export capacity

no export terminal tracked

Import capacity

1.1 Mtpa under construction

Pipelines

1

2,825 km tracked

Fleet

0

0 flagged, 0 owned from here

Import and export balance

DirectionTerminalsOperatingUnder construction
Export (liquefaction)0
Import (regasification)21.1

Figures are whole-terminal capacities in Mtpa, not adjusted for ownership stakes or utilisation.

LNG terminals in Cambodia

Import / exportTypeUnits
Botum Sakor LNG TerminalKoh KongImportNot reportedUnder construction1.1 Mtpaunder construction1
Cambodia LNG ProjectImportNot reportedCancelledNot reported2

Gas pipelines crossing Cambodia

Any pipeline whose country list includes this country, including transit pipelines that only pass through.

CountriesSegments
CNGC's Inter-Provincial Gas Pipeline NetworkCambodiaShelved2,825 kmNot reported1

Chokepoint exposure

Chokepoint exposure is shown on each terminal page, taken from a hand-maintained trade-lane table. It is an editorial routing model of typical laden voyages, not vessel tracking. The exposure feed aggregates it by chokepoint.