LNG Chain

Gas transmission pipeline · Almaty to Talgar

Almaty-Bayserke-Talgar Gas Pipeline

Almaty-Bayserke-Talgar Gas Pipeline is an operating gas transmission pipeline in Kazakhstan. The tracker lists 1 tracked segment, 64 km long and 2.4 bcm/y of capacity, starting up in 2014. It runs from Almaty to Talgar. It is owned by QazaqGaz.

Length

64 km

Capacity

2.4 bcm/y

1.8 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 630 mm (25 in)

Route

Almaty-Bayserke-Talgar Gas Pipeline runs from Almaty to Talgar. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Almaty
To
Talgar
Start country
Kazakhstan
End country
Kazakhstan
Countries crossed
Kazakhstan
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
83 km
GEM pipeline ID
P6830
Start year
2014
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
IOperatingAlmaty → Talgar642.4630 mm2014GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies