LNG Chain

Gas transmission pipeline · Gargždai to Vievis

Amber Grid Gas Transmission System

Amber Grid Gas Transmission System is a proposed gas transmission pipeline in Lithuania. The tracker lists 1 tracked segment, 287 km long. It runs from Gargždai to Vievis. It is owned by Amber Grid.

Length

287 km

Capacity

Not reported

Segments tracked

1

Largest diameter 1219 mm (48 in)

Route

Amber Grid Gas Transmission System runs from Gargždai to Vievis. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Gargždai
To
Vievis
Start country
Lithuania
End country
Lithuania
Countries crossed
Lithuania
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
286 km
GEM pipeline ID
P5661
Start year
Not reported
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Gargždai-VievisProposedGargždai → Vievis287Not reported1219 mmGEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Klaipeda FSRULithuaniaImportOperating4 kmroute proximity
Klaipeda Small-Scale LNG TerminalLithuaniaImportOperating4.9 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies