LNG Chain

Gas transmission pipeline · Taba to Aqaba

Arab Gas Pipeline

Arab Gas Pipeline is an operating gas transmission pipeline crossing Egypt, Jordan. The tracker lists 1 tracked segment, 18 km long and 10.3 bcm/y of capacity, starting up in 2003. It runs from Taba to Aqaba. It is owned by Egyptian Natural Gas Holding Co.

Length

18 km

Capacity

10.3 bcm/y

7.6 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 660 mm (26 in)

Route

Arab Gas Pipeline runs from Taba to Aqaba. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Taba
To
Aqaba
Start country
Egypt
End country
Jordan
Countries crossed
Egypt, Jordan
Onshore / offshore
Not reported
Fuel
Gas
Region
Africa
Route drawn on map
19 km
GEM pipeline ID
P7482
Start year
2003
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Taba-Aqaba Sea Gas PipelineOperatingTaba → Aqaba1810.3660 mm2003GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Sheikh Sabah LNG TerminalJordanImportUnder construction0.5 kmroute proximity
Aqaba Jordan FSRUJordanImportIdle0.8 kmroute proximity
Eilat FLNG TerminalIsraelExportCancelled17.9 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.