Gas transmission pipeline · Rihab to Jaber (Jordanian-Syrian Border)
Arab Gas Pipeline
Arab Gas Pipeline is an operating gas transmission pipeline in Jordan. The tracker lists 1 tracked segment, 30 km long and 10.3 bcm/y of capacity, starting up in 2007. It runs from Rihab to Jaber (Jordanian-Syrian Border). It is owned by Jordanian Egyptian Fajr Natural Gas Co.
Length
30 km
Capacity
10.3 bcm/y
7.6 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 914 mm (36 in)
Route
Arab Gas Pipeline runs from Rihab to Jaber (Jordanian-Syrian Border). The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Rihab
- To
- Jaber (Jordanian-Syrian Border)
- Start country
- Jordan
- End country
- Jordan
- Countries crossed
- Jordan
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 23 km
- GEM pipeline ID
- P7539
- Start year
- 2007
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Rihab-Jaber Gas Pipeline | Operating | Rihab → Jaber (Jordanian-Syrian Border) | 30 | 10.3 | 914 mm | 2007 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.