Gas transmission pipeline · Barnaul to Gorno-Altaysk
Barnaul-Biysk-Gorno-Altaysk Gas Pipeline
Barnaul-Biysk-Gorno-Altaysk Gas Pipeline is an operating gas transmission pipeline in Russia. The tracker lists 1 tracked segment, 325 km long and 1.7 bcm/y of capacity, starting up in 2006. It runs from Barnaul to Gorno-Altaysk. It is owned by Gazprom PJSC.
Length
325 km
Capacity
1.7 bcm/y
1.2 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 300 mm (12 in)
Route
Barnaul-Biysk-Gorno-Altaysk Gas Pipeline runs from Barnaul to Gorno-Altaysk. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Barnaul
- To
- Gorno-Altaysk
- Start country
- Russia
- End country
- Russia
- Countries crossed
- Russia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 228 km
- GEM pipeline ID
- P2282
- Start year
- 2006
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Barnaul → Gorno-Altaysk | 325 | 1.7 | 300 mm | 2006 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Gazprom PJSC100%
Parent companies
- Gazprom PJSC100%