LNG Chain

Gas transmission pipeline · Joint Petroleum Development Area to Beaço

Beaço Gas Pipeline

Beaço Gas Pipeline is a cancelled gas transmission pipeline crossing Joint Petroleum Development Area, Timor-Leste. The tracker lists 1 tracked segment, 150 km long, starting up in 2027. It runs from Joint Petroleum Development Area to Beaço. It is owned by TIMOR GAP, Woodside Energy and Osaka Gas Co Ltd.

Length

150 km

Capacity

Not reported

Segments tracked

1

Route

Beaço Gas Pipeline runs from Joint Petroleum Development Area to Beaço. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Joint Petroleum Development Area
To
Beaço
Start country
Timor-Leste
End country
Timor-Leste
Countries crossed
Joint Petroleum Development Area
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
195 km
GEM pipeline ID
P0903
Start year
2027
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineCancelledJoint Petroleum Development Area → Beaço150Not reported2027GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Sunrise LNG TerminalTimor-LesteExportProposed0 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.