Gas transmission pipeline · Beyneu (Beineu) to Shymkent

Beineu-Bozoy-Shymkent Gas Pipeline

Beineu-Bozoy-Shymkent Gas Pipeline is an under construction gas transmission pipeline in Kazakhstan. The tracker lists 1 tracked segment, 1,449 km long and 10 bcm/y of capacity, starting up in 2026. It runs from Beyneu (Beineu) to Shymkent. It is owned by QazaqGaz and UCC Holding.

Length

1,449 km

Capacity

10 bcm/y

7.4 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 1067 mm (42 in)

Route

Beineu-Bozoy-Shymkent Gas Pipeline runs from Beyneu (Beineu) to Shymkent. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Beyneu (Beineu)
To
Shymkent
Start country
Kazakhstan
End country
Kazakhstan
Countries crossed
Kazakhstan
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
1,426 km
GEM pipeline ID
P5788
Start year
2026
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
IIUnder constructionBeyneu (Beineu) → Shymkent1,449101067 mm2026GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators