Gas transmission pipeline · Posusje to Novi Travnik
Bosnia and Herzegovina–Croatia South Interconnection Gas Pipeline
Bosnia and Herzegovina–Croatia South Interconnection Gas Pipeline is a proposed gas transmission pipeline crossing Bosnia And Herzegovina, Croatia. The tracker lists 1 tracked segment, 168 km long and 1.5 bcm/y of capacity, starting up in 2026. It runs from Posusje to Novi Travnik. It is owned by Plinacro Ltd.
Length
168 km
Capacity
1.5 bcm/y
1.1 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 500 mm (20 in)
Route
Bosnia and Herzegovina–Croatia South Interconnection Gas Pipeline runs from Posusje to Novi Travnik. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Posusje
- To
- Novi Travnik
- Start country
- Bosnia and Herzegovina
- End country
- Bosnia and Herzegovina
- Countries crossed
- Bosnia And Herzegovina, Croatia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 163 km
- GEM pipeline ID
- P1321
- Start year
- 2026
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Posusje - Novi Travnik with branch to Mostar | Proposed | Posusje → Novi Travnik | 168 | 1.5 | 500 mm | 2026 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.