LNG Chain

Gas transmission pipeline · Beyneu to Gubkin

Central Asia–Center Gas Pipeline

Central Asia–Center Gas Pipeline is an operating gas transmission pipeline crossing Turkmenistan, Uzbekistan, Kazakhstan and 1 more. The tracker lists 1 tracked segment, 2,600 km long and 5 bcm/y of capacity, starting up in 1975. It runs from Beyneu to Gubkin. It is owned by Gazprom PJSC.

Length

2,600 km

Capacity

5 bcm/y

3.7 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 1220 mm (48 in)

Route

Central Asia–Center Gas Pipeline runs from Beyneu to Gubkin. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Beyneu
To
Gubkin
Start country
Turkmenistan
End country
Russia
Countries crossed
Turkmenistan, Uzbekistan, Kazakhstan, Russia
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
1,565 km
GEM pipeline ID
P2292
Start year
1975
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
CAC-3OperatingBeyneu → Gubkin2,60051220 mm1975GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Central Java FSRUIndonesiaImportCancelledname match
Yokkaichi LNG CenterJapanImportOperatingname match

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies