Gas transmission pipeline · Ohio to Ohio
Central Corridor Pipeline
Central Corridor Pipeline is an operating gas transmission pipeline in United States. The tracker lists 1 tracked segment, 19 km long and 0.01 bcm/y of capacity, starting up in 2022. It runs from Ohio to Ohio. It is owned by Duke Energy Corp.
Length
19 km
Capacity
0.01 bcm/y
0.0 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 508 mm (20 in)
Route
Central Corridor Pipeline runs from Ohio to Ohio. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Ohio
- To
- Ohio
- Start country
- United States
- End country
- United States
- Countries crossed
- United States
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 14 km
- GEM pipeline ID
- P0297
- Start year
- 2022
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Ohio → Ohio | 19 | 0.01 | 508 mm | 2022 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Central Java FSRU | Indonesia | Import | Cancelled | — | name match |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Duke Energy Corp100%
Parent companies
- Duke Energy Corp100%