Chittagong-Feni-Bakhrabad Gas Transmission Parallel Pipeline Project

Chittagong-Feni-Bakhrabad Gas Transmission Parallel Pipeline Project is an operating gas transmission pipeline in Bangladesh. The tracker lists 1 tracked segment, 181 km long and 8.18 bcm/y of capacity, starting up in 2020. It runs from Chittagong City to Bakhrabad. It is owned by Gas Transmission Co Ltd (GTCL).

Length

181 km

Capacity

8.18 bcm/y

6.0 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 914 mm (36 in)

Route

Chittagong-Feni-Bakhrabad Gas Transmission Parallel Pipeline Project runs from Chittagong City to Bakhrabad. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Chittagong City
To
Bakhrabad
Start country
Bangladesh
End country
Bangladesh
Countries crossed
Bangladesh
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
172 km
GEM pipeline ID
P0850
Start year
2020
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingChittagong City → Bakhrabad1818.18914 mm2020GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Pertamina Bangladesh FSRUBangladeshImportCancelled21.4 kmroute proximity
Cambodia LNG ProjectCambodiaImportCancelledname match
Filipinas LNG Gateway Project FSRUPhilippinesImportShelvedname match
Project Venezuela LNG TerminalVenezuelaExportCancelledname match
Yakutia LNG ProjectRussiaExportShelvedname match

Owners and operators

Stakes as reported by GEM per segment, merged across segments.