Gas transmission pipeline · Tianjin to Dingxing
CNOOC Coal Gasification Transmission Pipeline
CNOOC Coal Gasification Transmission Pipeline is an operating gas transmission pipeline in China. The tracker lists 1 tracked segment, 414 km long and 6.6 bcm/y of capacity, starting up in 2023. It runs from Tianjin to Dingxing.
Length
414 km
Capacity
6.6 bcm/y
4.9 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1016 mm (40 in)
Route
CNOOC Coal Gasification Transmission Pipeline runs from Tianjin to Dingxing. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Tianjin
- To
- Dingxing
- Start country
- China
- End country
- China
- Countries crossed
- China
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 154 km
- GEM pipeline ID
- P7713
- Start year
- 2023
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| First phase (Tianjin-Dingxing) | Operating | Tianjin → Dingxing | 414 | 6.6 | 1016 mm | 2023 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Tianjin LNG Terminal (PipeChina) | China | Import | Operating | 20.6 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Ownership is not reported for this pipeline.