LNG Chain

Gas transmission pipeline · Jezerisce to Rogatec

Croatia-Slovenia Interconnector Gas Pipeline

Croatia-Slovenia Interconnector Gas Pipeline is a proposed gas transmission pipeline in Croatia. The tracker lists 1 tracked segment, 8 km long and 5.7 bcm/y of capacity, starting up in 2030. It runs from Jezerisce to Rogatec. It is owned by Plinacro Ltd, Gas Connect Austria GmbH and Plinovodi doo.

Length

8 km

Capacity

5.7 bcm/y

4.2 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 700 mm (28 in)

Route

Croatia-Slovenia Interconnector Gas Pipeline runs from Jezerisce to Rogatec. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Jezerisce
To
Rogatec
Start country
Croatia
End country
Croatia
Countries crossed
Croatia
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
68 km
GEM pipeline ID
P1342
Start year
2030
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Jezerisce-SotlaProposedJezerisce → Rogatec85.7700 mm2030GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.