LNG Chain

Gas transmission pipeline · Egypt – Cyprus

Cronos-Port Said Gas Pipeline

Cronos-Port Said Gas Pipeline is a proposed gas transmission pipeline crossing Egypt, Cyprus. The tracker lists 1 tracked segment, 90 km long and 5.11 bcm/y of capacity, starting up in 2027.

Length

90 km

Capacity

5.11 bcm/y

3.8 Mtpa LNG equivalent

Segments tracked

1

Route

Cronos-Port Said Gas Pipeline runs from Egypt – Cyprus. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Not reported
To
Port Said
Start country
Cyprus
End country
Egypy
Countries crossed
Egypt, Cyprus
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
73 km
GEM pipeline ID
P7597
Start year
2027
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineProposed? → Port Said905.112027GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Ownership is not reported for this pipeline.