LNG Chain

Gas transmission pipeline · Duqm Refinery to Duqm SEZ

Duqm SEZ Gas Pipeline

Duqm SEZ Gas Pipeline is an operating gas transmission pipeline in Oman. The tracker lists 1 tracked segment, 17 km long, starting up in 2025. It runs from Duqm Refinery to Duqm SEZ. It is owned by OQGN.

Length

17 km

Capacity

Not reported

Segments tracked

1

Route

Duqm SEZ Gas Pipeline runs from Duqm Refinery to Duqm SEZ. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Duqm Refinery
To
Duqm SEZ
Start country
Oman
End country
Oman
Countries crossed
Oman
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
22 km
GEM pipeline ID
P7744
Start year
2025
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingDuqm Refinery → Duqm SEZ17Not reported2025GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners