LNG Chain

Gas transmission pipeline · Elenga to Tarakandi

Elenga-Tarakandi Gas Pipeline

Elenga-Tarakandi Gas Pipeline is an operating gas transmission pipeline in Bangladesh. The tracker lists 1 tracked segment, 42 km long and 0.82 bcm/y of capacity, starting up in 1991. It runs from Elenga to Tarakandi. It is owned by Titas Gas Transmission and Distribution Co (TGTDCL).

Length

42 km

Capacity

0.82 bcm/y

0.6 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 305 mm (12 in)

Route

Elenga-Tarakandi Gas Pipeline runs from Elenga to Tarakandi. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Elenga
To
Tarakandi
Start country
Bangladesh
End country
Bangladesh
Countries crossed
Bangladesh
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
40 km
GEM pipeline ID
P0856
Start year
1991
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingElenga → Tarakandi420.82305 mm1991GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.