LNG Chain

Gas transmission pipeline · Cygnus Gas Field to Bacton Terminal

Esmond Transmission System Pipeline

Esmond Transmission System Pipeline is an operating gas transmission pipeline in United Kingdom. The tracker lists 1 tracked segment, 165 km long, starting up in 1985. It runs from Cygnus Gas Field to Bacton Terminal. It is owned by Kellas Midstream Ltd, Ithaca Energy and Harbour Energy plc.

Length

165 km

Capacity

Not reported

Segments tracked

1

Largest diameter 610 mm (24 in)

Route

Esmond Transmission System Pipeline runs from Cygnus Gas Field to Bacton Terminal. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Cygnus Gas Field
To
Bacton Terminal
Start country
United Kingdom
End country
United Kingdom
Countries crossed
United Kingdom
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
166 km
GEM pipeline ID
P7438
Start year
1985
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingCygnus Gas Field → Bacton Terminal165Not reported610 mm1985GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.