LNG Chain

Gas transmission pipeline · Gassi Touil to Hassi Messaoud

Gassi Touil-Hassi Messaoud Gas Pipeline

Gassi Touil-Hassi Messaoud Gas Pipeline is an operating gas transmission pipeline in Algeria. The tracker lists 1 tracked segment, 150 km long and 6.44 bcm/y of capacity, starting up in 1976. It runs from Gassi Touil to Hassi Messaoud. It is owned by Sonatrach SpA.

Length

150 km

Capacity

6.44 bcm/y

4.7 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 1016 mm (40 in)

Route

Gassi Touil-Hassi Messaoud Gas Pipeline runs from Gassi Touil to Hassi Messaoud. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Gassi Touil
To
Hassi Messaoud
Start country
Algeria
End country
Algeria
Countries crossed
Algeria
Onshore / offshore
Not reported
Fuel
Gas
Region
Africa
Route drawn on map
146 km
GEM pipeline ID
P0464
Start year
1976
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingGassi Touil → Hassi Messaoud1506.441016 mm1976GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies