LNG Chain

Gas transmission pipeline · Carthage to Beaumont

Gemini Gulf Coast Pipeline

Gemini Gulf Coast Pipeline is a cancelled gas transmission pipeline in United States. The tracker lists 1 tracked segment, 241 km long and 15.33 bcm/y of capacity, starting up in 2022. It runs from Carthage to Beaumont. It is owned by Gemini Gulf Coast Pipeline LLC.

Length

241 km

Capacity

15.3 bcm/y

11.3 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 914 mm (36 in)

Route

Gemini Gulf Coast Pipeline runs from Carthage to Beaumont. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Carthage
To
Beaumont
Start country
United States
End country
United States
Countries crossed
United States
Onshore / offshore
Not reported
Fuel
Gas
Region
Americas
Route drawn on map
250 km
GEM pipeline ID
P1317
Start year
2022
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineCancelledCarthage → Beaumont24115.3914 mm2022GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Phillips 66 Beamont Oil TerminalUnited StatesExportOperating22 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.