LNG Chain

Gas transmission pipeline · Hajigabul (Kazi Magomed) to Mozdok

Hajigabul-Shirvanovka-Mozdok Pipeline

Hajigabul-Shirvanovka-Mozdok Pipeline is an operating gas transmission pipeline crossing Russia, Azerbaijan. The tracker lists 1 tracked segment, 680 km long and 10 bcm/y of capacity, starting up in 1982. It runs from Hajigabul (Kazi Magomed) to Mozdok. It is owned by SOCAR and Gazprom PJSC.

Length

680 km

Capacity

10 bcm/y

7.4 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 1220 mm (48 in)

Route

Hajigabul-Shirvanovka-Mozdok Pipeline runs from Hajigabul (Kazi Magomed) to Mozdok. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Hajigabul (Kazi Magomed)
To
Mozdok
Start country
Azerbaijan
End country
Russia
Countries crossed
Russia, Azerbaijan
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
693 km
GEM pipeline ID
P0751
Start year
1982
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingHajigabul (Kazi Magomed) → Mozdok680101220 mm1982GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.