LNG Chain

Gas transmission pipeline · Haradh Gas Plant to Uthmaniyah Gas Plant

Haradh-Uthmaniya Gas Pipeline

Haradh-Uthmaniya Gas Pipeline is an operating gas transmission pipeline in Saudi Arabia. The tracker lists 1 tracked segment, 140 km long, starting up in 2006. It runs from Haradh Gas Plant to Uthmaniyah Gas Plant. It is owned by Saudi Aramco.

Length

140 km

Capacity

Not reported

Segments tracked

1

Largest diameter 1219 mm (48 in)

Route

Haradh-Uthmaniya Gas Pipeline runs from Haradh Gas Plant to Uthmaniyah Gas Plant. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Haradh Gas Plant
To
Uthmaniyah Gas Plant
Start country
Saudi Arabia
End country
Saudi Arabia
Countries crossed
Saudi Arabia
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
136 km
GEM pipeline ID
P1905
Start year
2006
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingHaradh Gas Plant → Uthmaniyah Gas Plant140Not reported1219 mm2006GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies