LNG Chain

Gas transmission pipeline · Bayji to Nasiriyah

Iraq National Gas Pipeline

Iraq National Gas Pipeline is an operating gas transmission pipeline in Iraq. The tracker lists 1 tracked segment, 470 km long and 8.69 bcm/y of capacity. It runs from Bayji to Nasiriyah. It is owned by Iraq Ministry of Oil.

Length

470 km

Capacity

8.69 bcm/y

6.4 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 1067 mm (42 in)

Route

Iraq National Gas Pipeline runs from Bayji to Nasiriyah. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Bayji
To
Nasiriyah
Start country
Iraq
End country
Iraq
Countries crossed
Iraq
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
565 km
GEM pipeline ID
P4061
Start year
Not reported
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Trunkline (Baiji–Nasiriyah Branch)OperatingBayji → Nasiriyah4708.691067 mmGEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Parent companies