Gas transmission pipeline · Israel – Jordan
Israel Jordan Gas Pipeline
Israel Jordan Gas Pipeline is an operating gas transmission pipeline crossing Israel, Jordan. The tracker lists 1 tracked segment, 65 km long, starting up in 2020. It is owned by Energean E&P Holdings Ltd and Noble Energy.
Length
65 km
Capacity
Not reported
Segments tracked
1
Route
Israel Jordan Gas Pipeline runs from Israel – Jordan. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Leviathan fields
- To
- Not reported
- Start country
- Israel
- End country
- Jordan
- Countries crossed
- Israel, Jordan
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 220 km
- GEM pipeline ID
- P0480
- Start year
- 2020
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Leviathan fields → ? | 65 | Not reported | — | 2020 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Tamar FLNG Terminal | Israel | Export | Cancelled | 6.6 km | route proximity |
| Aqaba Jordan FSRU | Jordan | Import | Idle | — | name match |
| Jordan Cove LNG Terminal | United States | Export | Cancelled | — | name match |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.