LNG Chain

Gas transmission pipeline · Jagdishpur to Haldia

Jagdishpur-Haldia-Bokaro Dhamra-Paradip-Barauni-Guwahati

Jagdishpur-Haldia-Bokaro Dhamra-Paradip-Barauni-Guwahati is an under construction gas transmission pipeline in India. The tracker lists 1 tracked segment, 3,546 km long and 8.4 bcm/y of capacity, starting up in 2025. It runs from Jagdishpur to Haldia. It is owned by GAIL (India) Ltd.

Length

3,546 km

Capacity

8.4 bcm/y

6.2 Mtpa LNG equivalent

Segments tracked

1

Route

Jagdishpur-Haldia-Bokaro Dhamra-Paradip-Barauni-Guwahati runs from Jagdishpur to Haldia. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Jagdishpur
To
Haldia
Start country
India
End country
India
Countries crossed
India
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
3,344 km
GEM pipeline ID
P0929
Start year
2025
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineUnder constructionJagdishpur → Haldia3,5468.42025GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Haldia FSRUIndiaImportProposed0.1 kmroute proximity
Haldia LNG TerminalIndiaImportCancelled1.2 kmroute proximity
Digha FSRUIndiaImportCancelled4.4 kmroute proximity
Kukrahati LNG TerminalIndiaImportCancelled6.3 kmroute proximity
Dhamra LNG TerminalIndiaImportOperating7.5 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Parent companies