LNG Chain

Gas transmission pipeline · Karachaganak to Oral

Karachaganak-Uralsk Gas Pipeline

Karachaganak-Uralsk Gas Pipeline is an operating gas transmission pipeline in Kazakhstan. The tracker lists 1 tracked segment, 152 km long and 0.5 bcm/y of capacity, starting up in 2009. It runs from Karachaganak to Oral. It is owned by QazaqGaz.

Length

152 km

Capacity

0.5 bcm/y

0.4 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 508 mm (20 in)

Route

Karachaganak-Uralsk Gas Pipeline runs from Karachaganak to Oral. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Karachaganak
To
Oral
Start country
Kazakhstan
End country
Kazakhstan
Countries crossed
Kazakhstan
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
133 km
GEM pipeline ID
P3947
Start year
2009
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
IOperatingKarachaganak → Oral1520.5508 mm2009GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies