Gas transmission pipeline · Karasuk to Chany

Karasuk-Bagan-Kupino-Chistoozernoe-Chany Gas Pipeline

Karasuk-Bagan-Kupino-Chistoozernoe-Chany Gas Pipeline is a proposed gas transmission pipeline in Russia. The tracker lists 1 tracked segment, 207 km long, starting up in 2025. It runs from Karasuk to Chany. It is owned by Gazprom PJSC.

Length

207 km

Capacity

Not reported

Segments tracked

1

Route

Karasuk-Bagan-Kupino-Chistoozernoe-Chany Gas Pipeline runs from Karasuk to Chany. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Karasuk
To
Chany
Start country
Russia
End country
Russia
Countries crossed
Russia
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
207 km
GEM pipeline ID
P4110
Start year
2025
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineProposedKarasuk → Chany207Not reported2025GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies