Gas transmission pipeline · HSK to Primda
Kateřinský Potok Junction Point–Přimda Junction Point Gas Pipeline
Kateřinský Potok Junction Point–Přimda Junction Point Gas Pipeline is an operating gas transmission pipeline crossing Czechia, Germany. The tracker lists 1 tracked segment, 150 km long and 27.5 bcm/y of capacity, starting up in 2021. It runs from HSK to Primda. It is owned by Net4Gas.
Length
150 km
Capacity
27.5 bcm/y
20.2 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1397 mm (55 in)
Route
Kateřinský Potok Junction Point–Přimda Junction Point Gas Pipeline runs from HSK to Primda. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- HSK
- To
- Primda
- Start country
- Czech Republic
- End country
- Germany
- Countries crossed
- Czechia, Germany
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 141 km
- GEM pipeline ID
- P1698
- Start year
- 2021
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | HSK → Primda | 150 | 27.5 | 1397 mm | 2021 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Net4Gas100%