Gas transmission pipeline · Japan
Kinki Trunk Line No. 2 East Line
Kinki Trunk Line No. 2 East Line is an operating gas transmission pipeline in Japan. The tracker lists 1 tracked segment, 92 km long, starting up in 1978. It is owned by Osaka Gas Co Ltd.
Length
92 km
Capacity
Not reported
Segments tracked
1
Largest diameter 600 mm (24 in)
Route
Kinki Trunk Line No. 2 East Line runs from Japan. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Not reported
- To
- Not reported
- Start country
- Japan
- End country
- Japan
- Countries crossed
- Japan
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 82 km
- GEM pipeline ID
- P1018
- Start year
- 1978
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Not reported | 92 | Not reported | 600 mm | 1978 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Senboku 1 LNG Terminal | Japan | Import | Operating | 3.5 km | route proximity |
| Senboku 2 LNG Terminal | Japan | Import | Operating | 5 km | route proximity |
| Sakai LNG Terminal | Japan | Import | Operating | 5.8 km | route proximity |
| Wakayama LNG Terminal | Japan | Import | Cancelled | 24.9 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Osaka Gas Co Ltd100%
Parent companies
- Osaka Gas Co Ltd100%