Gas transmission pipeline · Kuakata to Khulna
Kuakata-PayraBarisal-Gopalganj-Pakirhat-Khulna Gas Transmission Pipeline
Kuakata-PayraBarisal-Gopalganj-Pakirhat-Khulna Gas Transmission Pipeline is a proposed gas transmission pipeline in Bangladesh. The tracker lists 1 tracked segment, 250 km long, starting up in 2025. It runs from Kuakata to Khulna. It is owned by Gas Transmission Co Ltd (GTCL).
Length
250 km
Capacity
Not reported
Segments tracked
1
Largest diameter 1067 mm (42 in)
Route
Kuakata-PayraBarisal-Gopalganj-Pakirhat-Khulna Gas Transmission Pipeline runs from Kuakata to Khulna. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Kuakata
- To
- Khulna
- Start country
- Bangladesh
- End country
- Bangladesh
- Countries crossed
- Bangladesh
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 251 km
- GEM pipeline ID
- P3918
- Start year
- 2025
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Proposed | Kuakata → Khulna | 250 | Not reported | 1067 mm | 2025 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Payra FSRU | Bangladesh | Import | Cancelled | 0.6 km | route proximity |
| Payra LNG Terminal | Bangladesh | Import | Cancelled | 3 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.