LNG Chain

Gas transmission pipeline · Kuakata to Khulna

Kuakata-PayraBarisal-Gopalganj-Pakirhat-Khulna Gas Transmission Pipeline

Kuakata-PayraBarisal-Gopalganj-Pakirhat-Khulna Gas Transmission Pipeline is a proposed gas transmission pipeline in Bangladesh. The tracker lists 1 tracked segment, 250 km long, starting up in 2025. It runs from Kuakata to Khulna. It is owned by Gas Transmission Co Ltd (GTCL).

Length

250 km

Capacity

Not reported

Segments tracked

1

Largest diameter 1067 mm (42 in)

Route

Kuakata-PayraBarisal-Gopalganj-Pakirhat-Khulna Gas Transmission Pipeline runs from Kuakata to Khulna. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Kuakata
To
Khulna
Start country
Bangladesh
End country
Bangladesh
Countries crossed
Bangladesh
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
251 km
GEM pipeline ID
P3918
Start year
2025
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineProposedKuakata → Khulna250Not reported1067 mm2025GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Payra FSRUBangladeshImportCancelled0.6 kmroute proximity
Payra LNG TerminalBangladeshImportCancelled3 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.