LNG Chain

Gas transmission pipeline · Mississippi Canyon to Louisiana

Mississippi Canyon Gas Pipeline

Mississippi Canyon Gas Pipeline is an operating gas transmission pipeline in United States. The tracker lists 1 tracked segment, 72 km long and 8.18 bcm/y of capacity, starting up in 1996. It runs from Mississippi Canyon to Louisiana. It is owned by Enbridge Inc.

Length

72 km

Capacity

8.18 bcm/y

6.0 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 762 mm (30 in)

Route

Mississippi Canyon Gas Pipeline runs from Mississippi Canyon to Louisiana. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Mississippi Canyon
To
Louisiana
Start country
United States
End country
United States
Countries crossed
United States
Onshore / offshore
Not reported
Fuel
Gas
Region
Americas
Route drawn on map
78 km
GEM pipeline ID
P0217
Start year
1996
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingMississippi Canyon → Louisiana728.18762 mm1996GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
CE FLNG TerminalUnited StatesExportCancelled2.6 kmroute proximity
West Delta LNG Deepwater Port TerminalUnited StatesExportShelved9.4 kmroute proximity
Louisiana LNG TerminalUnited StatesExportCancelled17.4 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies