LNG Chain

Gas transmission pipeline · Ramat Hovav industrial zone to Egyptian/Israeli Borders

Nitzana Pipeline

Nitzana Pipeline is an under construction gas transmission pipeline crossing Israel, Egypt. The tracker lists 1 tracked segment, 65 km long and 6.13 bcm/y of capacity, starting up in 2029. It runs from Ramat Hovav industrial zone to Egyptian/Israeli Borders. It is owned by NewMedEnergy, Chevron and Ratio Energies LP.

Length

65 km

Capacity

6.13 bcm/y

4.5 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 914 mm (36 in)

Route

Nitzana Pipeline runs from Ramat Hovav industrial zone to Egyptian/Israeli Borders. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Ramat Hovav industrial zone
To
Egyptian/Israeli Borders
Start country
Israel
End country
Egypt
Countries crossed
Israel, Egypt
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
79 km
GEM pipeline ID
P7864
Start year
2029
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineUnder constructionRamat Hovav industrial zone → Egyptian/Israeli Borders656.13914 mm2029GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.