Gas transmission pipeline · Batajnica to Paracin
Nooros–Abu Madi–El Gamil Gas Pipline
Nooros–Abu Madi–El Gamil Gas Pipline is an operating gas transmission pipeline in Serbia. The tracker lists 1 tracked segment, 173 km long. It runs from Batajnica to Paracin. It is owned by Srbijagas.
Length
173 km
Capacity
Not reported
Segments tracked
1
Largest diameter 610 mm (24 in)
Route
Nooros–Abu Madi–El Gamil Gas Pipline runs from Batajnica to Paracin. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Batajnica
- To
- Paracin
- Start country
- Serbia
- End country
- Serbia
- Countries crossed
- Serbia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 173 km
- GEM pipeline ID
- P4366
- Start year
- Not reported
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Batajnica-Paracin | Operating | Batajnica → Paracin | 173 | Not reported | 610 mm | — | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Srbijagas100%
Parent companies
- Srbijagas JP100%