LNG Chain

Gas transmission pipeline · Ojinaga to El Encino

Ojinaga-El Encino Gas Pipeline

Ojinaga-El Encino Gas Pipeline is an operating gas transmission pipeline in Mexico. The tracker lists 1 tracked segment, 220 km long and 13.86 bcm/y of capacity, starting up in 2017. It runs from Ojinaga to El Encino. It is owned by IEnova.

Length

220 km

Capacity

13.9 bcm/y

10.2 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 1067 mm (42 in)

Route

Ojinaga-El Encino Gas Pipeline runs from Ojinaga to El Encino. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Ojinaga
To
El Encino
Start country
Mexico
End country
Mexico
Countries crossed
Mexico
Onshore / offshore
Not reported
Fuel
Gas
Region
Americas
Route drawn on map
232 km
GEM pipeline ID
P0422
Start year
2017
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingOjinaga → El Encino22013.91067 mm2017GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies