Gas transmission pipeline · Ojinaga to El Encino
Ojinaga-El Encino Gas Pipeline
Ojinaga-El Encino Gas Pipeline is an operating gas transmission pipeline in Mexico. The tracker lists 1 tracked segment, 220 km long and 13.86 bcm/y of capacity, starting up in 2017. It runs from Ojinaga to El Encino. It is owned by IEnova.
Length
220 km
Capacity
13.9 bcm/y
10.2 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1067 mm (42 in)
Route
Ojinaga-El Encino Gas Pipeline runs from Ojinaga to El Encino. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Ojinaga
- To
- El Encino
- Start country
- Mexico
- End country
- Mexico
- Countries crossed
- Mexico
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 232 km
- GEM pipeline ID
- P0422
- Start year
- 2017
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Ojinaga → El Encino | 220 | 13.9 | 1067 mm | 2017 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- IEnova100%
Parent companies
- Sempra Energy100%