LNG Chain

Gas transmission pipeline · Kozarac to Slobodnica

Omišalj-Zlobin-Bosiljevo-Sisak-Kozarac-Slobodnica LNG main evacuation pipeline

Omišalj-Zlobin-Bosiljevo-Sisak-Kozarac-Slobodnica LNG main evacuation pipeline is a proposed gas transmission pipeline in Croatia. The tracker lists 1 tracked segment, 128 km long and 3.29 bcm/y of capacity, starting up in 2030. It runs from Kozarac to Slobodnica. It is owned by Plinacro Ltd.

Length

128 km

Capacity

3.29 bcm/y

2.4 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 800 mm (31 in)

Route

Omišalj-Zlobin-Bosiljevo-Sisak-Kozarac-Slobodnica LNG main evacuation pipeline runs from Kozarac to Slobodnica. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Kozarac
To
Slobodnica
Start country
Croatia
End country
Croatia
Countries crossed
Croatia
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
115 km
GEM pipeline ID
P2191
Start year
2030
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Kozarac-SlobodnicaProposedKozarac → Slobodnica1283.29800 mm2030GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies