Pince-Lendava-Kidričevo Gas Pipeline

Pince-Lendava-Kidričevo Gas Pipeline is a proposed gas transmission pipeline in Slovenia. The tracker lists 1 tracked segment, 73 km long and 1.54 bcm/y of capacity, starting up in 2028. It runs from Pince to Kidričevo. It is owned by Plinovodi doo.

Length

73 km

Capacity

1.54 bcm/y

1.1 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 500 mm (20 in)

Route

Pince-Lendava-Kidričevo Gas Pipeline runs from Pince to Kidričevo. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Pince
To
Kidričevo
Start country
Slovenia
End country
Slovenia
Countries crossed
Slovenia
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
65 km
GEM pipeline ID
P1708
Start year
2028
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Pince-Lendava-Kidričevo Gas PipelineProposedPince → Kidričevo731.54500 mm2028GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies