LNG Chain

Gas transmission pipeline · Saih Nihayda Gas Plant to Al Kamil

SNGP Loop Gas Pipeline

SNGP Loop Gas Pipeline is an operating gas transmission pipeline in Oman. The tracker lists 1 tracked segment, 265 km long and 21.9 bcm/y of capacity, starting up in 2006. It runs from Saih Nihayda Gas Plant to Al Kamil. It is owned by OQGN.

Length

265 km

Capacity

21.9 bcm/y

16.1 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 1219 mm (48 in)

Route

SNGP Loop Gas Pipeline runs from Saih Nihayda Gas Plant to Al Kamil. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Saih Nihayda Gas Plant
To
Al Kamil
Start country
Oman
End country
Oman
Countries crossed
Oman
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
276 km
GEM pipeline ID
P7718
Start year
2006
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingSaih Nihayda Gas Plant → Al Kamil26521.91219 mm2006GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners