Gas transmission pipeline · Minsk to Gomel
Torzhok-Minsk-Ivatsevichy Gas Pipeline
Torzhok-Minsk-Ivatsevichy Gas Pipeline is an operating gas transmission pipeline in Belarus. The tracker lists 1 tracked segment, 285 km long, starting up in 1984. It runs from Minsk to Gomel. It is owned by Gazprom PJSC.
Length
285 km
Capacity
Not reported
Segments tracked
1
Route
Torzhok-Minsk-Ivatsevichy Gas Pipeline runs from Minsk to Gomel. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Minsk
- To
- Gomel
- Start country
- Belarus
- End country
- Belarus
- Countries crossed
- Belarus
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 284 km
- GEM pipeline ID
- P7032
- Start year
- 1984
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Minsk-Gomel Branch Gas Pipeline | Operating | Minsk → Gomel | 285 | Not reported | — | 1984 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Gazprom PJSC100%
Parent companies
- Gazprom PJSC100%