Gas transmission pipeline · Balkanabat to Sangachal Terminal
Trans-Caspian Gas Pipeline
Trans-Caspian Gas Pipeline is a proposed gas transmission pipeline crossing Turkmenistan, Azerbaijan. The tracker lists 1 tracked segment, 300 km long and 16 bcm/y of capacity, starting up in 2029. It runs from Balkanabat to Sangachal Terminal. It is owned by W-Stream Caspian Pipeline Co Ltd.
Length
300 km
Capacity
16 bcm/y
11.8 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 915 mm (36 in)
Route
Trans-Caspian Gas Pipeline runs from Balkanabat to Sangachal Terminal. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Balkanabat
- To
- Sangachal Terminal
- Start country
- Turkmenistan
- End country
- Azerbaijan
- Countries crossed
- Turkmenistan, Azerbaijan
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 436 km
- GEM pipeline ID
- P0764
- Start year
- 2029
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Phase I | Proposed | Balkanabat → Sangachal Terminal | 300 | 16 | 915 mm | 2029 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.