LNG Chain

Gas transmission pipeline · Rio Blanco County to San Juan County

TransColorado Gas Pipeline

TransColorado Gas Pipeline is an operating gas transmission pipeline in United States. The tracker lists 1 tracked segment, 499 km long and 10.22 bcm/y of capacity, starting up in 1996. It runs from Rio Blanco County to San Juan County. It is owned by Kinder Morgan Inc.

Length

499 km

Capacity

10.2 bcm/y

7.5 Mtpa LNG equivalent

Segments tracked

1

Route

TransColorado Gas Pipeline runs from Rio Blanco County to San Juan County. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Rio Blanco County
To
San Juan County
Start country
United States
End country
United States
Countries crossed
United States
Onshore / offshore
Not reported
Fuel
Gas
Region
Americas
Route drawn on map
481 km
GEM pipeline ID
P0270
Start year
1996
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingRio Blanco County → San Juan County49910.21996GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Parent companies