LNG Chain

Gas transmission pipeline · Salamanca to El Sauz

Tula-Villa de Reyes Gas Pipeline

Tula-Villa de Reyes Gas Pipeline is an operating gas transmission pipeline in Mexico. The tracker lists 1 tracked segment, 120 km long and 9.05 bcm/y of capacity, starting up in 2023. It runs from Salamanca to El Sauz. It is owned by TC Energy Corp.

Length

120 km

Capacity

9.05 bcm/y

6.7 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 914 mm (36 in)

Route

Tula-Villa de Reyes Gas Pipeline runs from Salamanca to El Sauz. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Salamanca
To
El Sauz
Start country
Mexico
End country
Mexico
Countries crossed
Mexico
Onshore / offshore
Not reported
Fuel
Gas
Region
Americas
Route drawn on map
112 km
GEM pipeline ID
P7616
Start year
2023
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Lateral sectionOperatingSalamanca → El Sauz1209.05914 mm2023GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners