Gas transmission pipeline · Vodice to Novo mesto
Vodice-Jarše-Novo mesto pipeline
Vodice-Jarše-Novo mesto pipeline is a proposed gas transmission pipeline in Slovenia. The tracker lists 1 tracked segment, 66 km long, starting up in 2027. It runs from Vodice to Novo mesto. It is owned by Plinovodi doo.
Length
66 km
Capacity
Not reported
Segments tracked
1
Largest diameter 400 mm (16 in)
Route
Vodice-Jarše-Novo mesto pipeline runs from Vodice to Novo mesto. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Vodice
- To
- Novo mesto
- Start country
- Slovenia
- End country
- Slovenia
- Countries crossed
- Slovenia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 77 km
- GEM pipeline ID
- P2467
- Start year
- 2027
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Proposed | Vodice → Novo mesto | 66 | Not reported | 400 mm | 2027 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Plinovodi doo100%
Parent companies
- Plinhold doo100%