LNG Chain

Gas transmission pipeline · Germany

Wilhelmshaven LNG Terminal Pipeline

Wilhelmshaven LNG Terminal Pipeline is an operating gas transmission pipeline in Germany. The tracker lists 1 tracked segment, 28 km long and 10 bcm/y of capacity, starting up in 2023. It is owned by Open Grid Europe.

Length

28 km

Capacity

10 bcm/y

7.4 Mtpa LNG equivalent

Segments tracked

1

Route

Wilhelmshaven LNG Terminal Pipeline runs from Germany. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Wilhelmshaven
To
Not reported
Start country
Germany
End country
Germany
Countries crossed
Germany
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
21 km
GEM pipeline ID
P3914
Start year
2023
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingWilhelmshaven → ?28102023GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Jade Energy LNG TerminalGermanyImportProposed4.5 kmroute proximity
Wilhelmshaven NWO FSRUGermanyImportCancelled4.5 kmroute proximity
Wilhelmshaven TES FSRUGermanyImportOperating5.7 kmroute proximity
Wilhelmshaven FSRUGermanyImportOperating7.2 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Parent companies