Liquefaction process and equipment
Shell
Licenses the DMR dual mixed refrigerant process, used at Sakhalin, Prelude and LNG Canada, and the parallel mixed refrigerant PMR process for trains of 6 to 11 Mtpa.
Shell is linked to 16 terminals, 36 pipelines in the tracker.
Terminals in the tracker
16
as owner, operator or parent
Pipelines
36
Carriers
0
Profile
- Headquarters
- United Kingdom
- Listed as
- Not reported
- Segments
- Liquefaction process and equipment
- In the tracker as
- Shell
Assets in the tracker
Where this firm appears in Global Energy Monitor's data as an owner, operator, parent or builder.
Terminals
- Arrow Energy LNG TerminalAustralia
- Brunei LNG TerminalBrunei · 7.7 Mtpa
- Dragon LNG TerminalUnited Kingdom · 5.6 Mtpa
- Engro FSRU 2Pakistan
- Gibraltar LNG TerminalGibraltar · 0.1 Mtpa
- Ivory Coast FSRUCôte d'Ivoire
- North West Shelf LNG TerminalAustralia · 14.4 Mtpa
- Paraná FSRUBrazil
- Persian NIOC LNG TerminalIran
- Peru LNG TerminalPeru · 4.45 Mtpa
- Prelude FLNG TerminalAustralia · 3.6 Mtpa
- Priolo Augusta LNG TerminalItaly
Pipelines
- Abadi Gas Pipeline150 km
- Arrow Bowen Pipeline580 km
- Asab–Bab-Habshan gas Pipeline88 km
- Bab-Habshan–Ruwais gas Pipeline100 km
- Bab-Habshan–Umm al-Nar gas Pipeline130 km
- Braemar 2 Pipeline110 km
- Bu Hasa–Bab-Habshan gas Pipeline45 km
- Chasco Bay-Vallenar Gas Pipeline92 km
- Crux Gas Pipeline160 km
- Cyprus–Egypt Gas Pipeline280 km
- Dragon Gas Pipeline22 km
- ECMA Development Gas Pipeline97 km
Named on these assets
Projects this firm is named on in our curated file, each supported by a source below.