Export terminal · Damiette, Egypt
Damietta SEGAS LNG Terminal
Damietta SEGAS LNG Terminal is an operating LNG export terminal in Damiette, Egypt. The tracker lists 2 tracked units with 5 Mtpa operating, the earliest starting in 2005. It is owned by Spanish Egyptian Gas Company SAE.
Operating
5 Mtpa
6.8 bcm/y · 1 unit
Under construction
—
no units under construction
Proposed
—
no units proposed
At a glance
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Unit T1 | Operating | 5 | 6.8 | 2005 | — | Not reported | Spanish Egyptian Gas Company SAE [100%] |
| Unit T2 | Shelved | 5 | 6.8 | — | — | Not reported | Spanish Egyptian Gas Company SAE [100%] |
Capacity by status
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Owners
Operators
Location
Damietta SEGAS LNG Terminal at 31.4690° N, 31.7473° E, with 8 tracked gas pipelines passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 31.4690° N, 31.7473° E
- Coordinate accuracy (GEM)
- exact
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| Cyprus–Egypt Gas Pipeline | Proposed | 280 km | 0.08 bcm/y | 0 km | route proximity |
| Damietta-Idku Gas Pipeline | Operating | 165 km | — | 0 km | route proximity |
| Damietta–SEGAS Pipeline | Operating | 12 km | — | 0 km | route proximity |
| Al Gamil–Damietta Gas Pipeline | Operating | 50 km | 7.67 bcm/y | 0.4 km | route proximity |
| Port Said-Arish Gas Pipeline | Operating | 235 km | — | 6.1 km | route proximity |
| Nooros–Abu Madi–El Gamil Gas Pipline | Operating | 92 km | 7.15 bcm/y | 12.4 km | route proximity |
| Gamasa–Veunsa Gas Pipeline | Operating | 34 km | 0.07 bcm/y | 13.7 km | route proximity |
| Gamasa-Edku Gas Pipeline | Proposed | 121 km | — | 21.4 km | route proximity |
Exposed to chokepoints
Where cargoes from this terminal would normally pass a maritime chokepoint, by destination market.
| Destination | Chokepoints on the usual route | Alternative route |
|---|---|---|
| Europe | Strait of Gibraltar | — |
Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, or take the machine-readable exposure feed. Links to the Chokepoints site are inactive until its domain is set in the environment.