Export terminal · Canada
Kitimat LNG Terminal
Kitimat LNG Terminal is a cancelled LNG export terminal in Canada. The tracker lists 1 tracked unit; capacity is not reported. It is owned by Chevron Canada Ltd and Woodside Energy.
Operating
—
no units operating
Under construction
—
no units under construction
Proposed
—
no units proposed
At a glance
- Country
- Canada
- State / province
- Not reported
- Region
- Not reported
- Import / export
- Export
- Onshore / floating
- Not reported
- Status (rolled up)
- Cancelled
- Trains / phases tracked
- 1
- Earliest start year
- Not reported
- Latest start year
- Not reported
- Coordinates
- 53.9254° N, 128.7531° W
- GEM terminal ID
- T100000130356
- GEM wiki page
- gem.wiki
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Unit T1-T3 | Cancelled | 18 | 24.5 | — | — | Not reported | Chevron Canada Ltd [50%]; Woodside Energy Group Ltd [50%] |
Capacity by status
| Status | Units | Mtpa | bcm/y |
|---|---|---|---|
| Cancelled | 1 | 18 | 24.5 |
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Owners
Operators
Location
Kitimat LNG Terminal at 53.9254° N, 128.7531° W, with 3 tracked gas pipelines passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 53.9254° N, 128.7531° W
- Coordinate accuracy (GEM)
- exact
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| Cedar LNG Pipeline | Under construction | 8 km | 4.09 bcm/y | 6.7 km | route proximity |
| Coastal GasLink Pipeline | Operating | 670 km | 21.46 bcm/y | 12.2 km | route proximity |
| Pacific Trail Gas Pipelines | Shelved | 471 km | 13.9 bcm/y | 15 km | route proximity |