LNG Chain

Import terminal · Germany

Lubmin FSRU

Lubmin FSRU is a proposed LNG import terminal (floating storage and regasification unit (FSRU)) in Germany. The tracker lists 2 tracked units; capacity is not reported, with the earliest start year 2023. Ownership is not reported.

Operating

no units operating

Under construction

no units under construction

Proposed

Not reported

1 unit, capacity not reported

At a glance

Country
Germany
State / province
Not reported
Region
Not reported
Import / export
Import
Onshore / floating
FSRU
Status (rolled up)
Proposed
Trains / phases tracked
2
Earliest start year
2023
Latest start year
2023
Coordinates
54.1533° N, 13.6453° E
GEM terminal ID
T100000131077
GEM wiki page
gem.wiki

Trains and phases

Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.

UnitStatusCapacity (Mtpa)Capacity (bcm/y)StartProposedFIDOwner (as reported)
Unit LNG import terminalRetired3.825.22023Not reportedNot reported
Unit Hydrogen import terminalProposedNot reportedNot reportedNot reportedNot reported

Some units are reported by GEM in bcm/y; Mtpa is derived at 1 Mtpa = 1.36 bcm/y.

Capacity by status

StatusUnitsMtpabcm/y
Proposed1Not reportedNot reported
Retired13.825.2

Owners and operators

Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.

Ownership is not reported for this terminal.

Location

Lubmin FSRU at 54.1533° N, 13.6453° E, with 5 tracked gas pipelines passing within 25 km.

Loads about 250 kB of map code and the country outline file.

Coordinates
54.1533° N, 13.6453° E
Coordinate accuracy (GEM)
approximate
Open in OpenStreetMap
View on map

Connected gas pipelines

Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.

PipelineStatusLengthCapacityDistanceMatched by
Nord Stream 2 Gas PipelineMothballed1,230 km55 bcm/y0.5 kmroute proximity
Nord Stream Gas PipelineMothballed1,222 km55 bcm/y0.5 kmroute proximity
European Gas Pipeline Link (EUGAL)Operating485 km55 bcm/y0.7 kmroute proximity
OPAL Gas PipelineOperating470 km35 bcm/y0.7 kmroute proximity
NEL Gas PipelineOperating440 km20 bcm/y0.8 kmroute proximity

Supplied via

Chokepoints that cargoes arriving at this terminal typically cross, based on where its region is supplied from.

  • Strait of Gibraltar
  • Suez Canal
  • Bab el-Mandeb
  • Danish Straits

Atlantic-basin supply from the United States crosses no chokepoint, which is why the European exposure figure is lower than it looks.

Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, or take the machine-readable exposure feed. Links to the Chokepoints site are inactive until its domain is set in the environment.