Export terminal · Queensland, Australia
Queensland Curtis LNG Terminal
Queensland Curtis LNG Terminal is an operating LNG export terminal in Queensland, Australia. The tracker lists 2 tracked units with 8.5 Mtpa operating, the earliest starting in 2015. Ownership is not reported.
Operating
8.5 Mtpa
11.6 bcm/y · 2 units
Under construction
—
no units under construction
Proposed
—
no units proposed
At a glance
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Unit T1 | Operating | 4.25 | 5.78 | 2015 | — | Not reported | Not reported |
| Unit T2 | Operating | 4.25 | 5.78 | 2015 | — | Not reported | Not reported |
Capacity by status
| Status | Units | Mtpa | bcm/y |
|---|---|---|---|
| Operating | 2 | 8.5 | 11.6 |
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Operators
Location
Queensland Curtis LNG Terminal at 23.7693° S, 151.1990° E, with 11 tracked gas pipelines passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 23.7693° S, 151.1990° E
- Coordinate accuracy (GEM)
- exact
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| Papua New Guinea to Queensland Gas Pipeline | Cancelled | 3,800 km | 6.13 bcm/y | 1.4 km | route proximity |
| APLNG Pipeline | Operating | 530 km | 15.11 bcm/y | 2 km | route proximity |
| Queensland Gas Pipeline | Operating | 629 km | 1.5 bcm/y | 5.5 km | route proximity |
| Wallumbilla–Gladstone Pipeline | Operating | 540 km | — | 5.5 km | route proximity |
| Wide Bay Pipeline | Operating | 274 km | 0.06 bcm/y | 7.3 km | route proximity |
| GLNG Pipeline | Operating | 435 km | 13.85 bcm/y | 8.8 km | route proximity |
| Arrow Bowen Pipeline | Cancelled | 580 km | 15.05 bcm/y | 15 km | route proximity |
| North Queensland Gas Pipeline | Operating | 391 km | 1.08 bcm/y | — | name match |
| Queensland Hunter Gas Pipeline | Proposed | 833 km | 4.52 bcm/y | — | name match |
| Queensland Hunter Gas Pipeline | Proposed | 60 km | 2.01 bcm/y | — | name match |
| South West Queensland Pipeline | Operating | 937 km | 4.05 bcm/y | — | name match |