Import terminal · KwaZulu-Natal, South Africa
Richards Bay Transnet FSRU
Richards Bay Transnet FSRU is a proposed LNG import terminal (floating storage and regasification unit (FSRU)) in KwaZulu-Natal, South Africa. The tracker lists 2 tracked units with 4.56 Mtpa proposed. It is owned by Zululand Energy Terminal Pty Ltd.
Operating
—
no units operating
Under construction
—
no units under construction
Proposed
4.56 Mtpa
6.2 bcm/y · 2 units
At a glance
- Country
- South Africa
- State / province
- KwaZulu-Natal
- Region
- Not reported
- Import / export
- Import
- Onshore / floating
- FSRU
- Status (rolled up)
- Proposed
- Trains / phases tracked
- 2
- Earliest start year
- Not reported
- Latest start year
- Not reported
- Coordinates
- 28.8062° S, 32.0592° E
- GEM terminal ID
- T100000131126
- GEM wiki page
- gem.wiki
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Unit Phase 1 | Proposed | 3.04 | 4.13 | — | — | Not reported | Zululand Energy Terminal Pty Ltd [100%] |
| Unit Phase 2 | Proposed | 1.52 | 2.07 | — | — | Not reported | Zululand Energy Terminal Pty Ltd [100%] |
Capacity by status
| Status | Units | Mtpa | bcm/y |
|---|---|---|---|
| Proposed | 2 | 4.56 | 6.2 |
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Owners
Operators
Location
Richards Bay Transnet FSRU at 28.8062° S, 32.0592° E, with 3 tracked gas pipelines passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 28.8062° S, 32.0592° E
- Coordinate accuracy (GEM)
- approximate
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| Phased Gas Pipeline Network | Proposed | 515 km | — | 0.6 km | route proximity |
| Secunda–Durban Lilly Gas Pipeline | Operating | 600 km | 0.61 bcm/y | 3.1 km | route proximity |
| Phased Gas Pipeline Network | Proposed | 210 km | — | 7.6 km | route proximity |
Supplied via
Chokepoints that cargoes arriving at this terminal typically cross, based on where its region is supplied from.
- Strait of Gibraltar
- Suez Canal
- Bab el-Mandeb
- Danish Straits
Atlantic-basin supply from the United States crosses no chokepoint, which is why the European exposure figure is lower than it looks.
Routing is an editorial model of typical laden voyages, held in a hand-maintained lane table. It is not vessel tracking, and it does not account for diversions, canal draught limits, ice class or seasonal closures. See methodology, or take the machine-readable exposure feed. Links to the Chokepoints site are inactive until its domain is set in the environment.